Please excuse all of my past post, Google deleted all of my photos.
DONE:
This clock will be on display at Gallery M
in Half Moon Bay, Ca. starting Jan. 16, 2015
go take a look.
Saturday, January 3, 2015
Saturday, December 27, 2014
Clock Building #52
Started the clock for the first time at 10:00 AM today.
Still need about three, four day to finish last details.
Check back late next week for a posed photo.
Still need about three, four day to finish last details.
Check back late next week for a posed photo.
Wednesday, December 24, 2014
Clock building #52
Monday, December 1, 2014
Frame building #52
Frame is together.
Next steps trim around the base, inlay/bottom in the base, levelers, inlay between the top and bottom, lights, pendulum hanger, mounting the clock, and a few things I am sure.
.
Next steps trim around the base, inlay/bottom in the base, levelers, inlay between the top and bottom, lights, pendulum hanger, mounting the clock, and a few things I am sure.
.
Friday, November 28, 2014
Thursday, November 27, 2014
Frame building # 52
All 32pc. together in individual frames
now these frames well be put together to
make the top and bottom clock frames.
.
now these frames well be put together to
make the top and bottom clock frames.
.
Sunday, November 23, 2014
Frame building #52
All 32 pc. cut to width,length,profiled, and joints cut.
Ready now to join them together into individual frames.
Ready now to join them together into individual frames.
Subscribe to:
Posts (Atom)